Today, I will tell you about it.Speak.How to correctly operate the blister machine! If there is any small partner who does not know how to operate the blister machine, please go and have a look with me.
A blister machine with excellent quality, if it is handed over to a machine that does not understand the operation of the machine at all.The result of operating with a person who is proficient in machinery and equipment is obvious. So today Xiaobian explain to you what preparations need to be made to operate the blister machine.
blister machine preparation before the boot:
Wear the safety protective clothing specified by the workshop before work. Clean up the environment around the equipment, and do not store any articles unrelated to production.
Clean up the sundries inside and outside the workbench and equipment, wipe the blister mold with clean cotton yarn, and remove the oil stain on the surface of the mold.
Before starting, carefully check the power supply, control system and heating system of the blister machine to see if it is normal, add lubricating oil as required, and whether the button is in the accurate position, and start as required for trial operation. Accurately install the mold on the blister machine.
Check whether the raw materials meet the requirements of the machine. When the raw material needs to be dried, it should be dried in the oven according to the delineation. The desired temperature is set according to the thickness of the material to be processed, and the mold is preheated. Check whether the feeding machine is rotating and whether the blister machine is on.
Press the main power button, and then press the heating switch to preheat and record the adjustment to avoid wasting materials.Heating time, vacuum time, cooling time and blowing time of each product; Press in the compressed power supply, adjust the pressure to the appropriate value, and check whether the components are normal; put each component in the original position, turn the switch to automatic gear, and run with no load.Check whether each program works normally 2-3 times. After the empty pump of the real cup lid machine is started, it will automatically run through the machine. After the lower cylinder rises, the vacuum sound absorption will be heard or the vacuum needle will be seen back, which means the vacuum system is normal. Turn the switch to manual, and manually debug whether each action is normal one by one, and turn it to normal. No articles are allowed to be placed under the electric furnace box. Manually place sheet in the mold, the cup machine is sealed around, the pressing switch is turned on, the pressing frame is used to press the film, and the heating time is adjusted. Press the heating button of the electric furnace to move the electric furnace to the working position, heat it, observe the heating situation, and make the best product in the best state. After heating, the electric furnace will automatically return to the empty position, and press the automatic starting button. This machine will automatically complete the upper mold, lower mold, heating, vacuuming, cold air blowing and demoulding.
When the material temperature and mold temperature reach the predetermined parameters (requirements), the mold shall be checked for impurities and sundries during loading and discharging. Hard objects and metal objects are strictly prohibited from entering the mold.
Pre-processing is carried out, and the deformation of the material is observed, and the parameters are adjusted according to it until it is smooth and shiny on average and meets the requirements. After confirming that all parts are normal, the materials can be officially released for normal production. During the operation, the changes of temperature and pressure should be paid attention to at any time. If abnormal conditions are found, the machine should be shut down. The closed power supply should be repaired by the mechanic and used after recovery.
When abnormal noise, peculiar smell, spark, oil leakage and other abnormal conditions are found in the operation of the machine tool, the machine should stop immediately, report to the relevant personnel immediately, and explain the fault phenomenon and the possible causes.
Pay attention to safe operation, and do not allow any reason or excuse to make operations that may cause personal injury or damage to the equipment.
Shutdown Precautions:
After the production is completed, the power supply of the electric furnace, the power supply of the temperature control box and the total power supply shall be turned off respectively.
Close the cooling water pipeline and turn each switchIn the "off" position, the main power switch of the machine tool shall be turned off during the last shutdown on holidays. Clean up the sundries, oil stains and dust on the machine tool, workbench and ground, and keep the workplace clean and tidy.
SHENZHEN YONGHENGSHENG MACHINERY MANUFACTURING CO., LTD19 years has been committed to research and development to provide ShenzhenBlister machineShenzhen bubble shell machine, Shenzhen vacuumBlister machine, Shenzhen thick filmBlister machine, ShenzhenBlister forming machineMachine, Shenzhen ThermoplasticMoldingMachine,Blister machineHotline:0755-84817776If you want to know more knowledge, you can also go to the official website to have a look.www.szyongheng.cn/