Five steps in the operation process of thick sheet blister machine:
 
1. Cleaning (workbench cleaning, mold cleaning, etc.);
 
2. Turn on the blister machine to preheat
 
1. Turn on the power switch of the device;
 
2. Turn on the air compressor and vacuum pump for use;
 
3. After the air compressor has sufficient air pressure, open the floating plate to the end point;
 
4. Lower the pressure plate to the lowest position;
 
5. Check whether the mold table is at the lowest position, press the heating box forward button after confirming that it is at the lowest position, and make the heating box move forward until it falls and seals with the pressure plate;
 
6. Turn on the heating button, and set the temperature control table, temperature and time (adjust the settings according to different plates and thicknesses).
 
Three, sheet heating stage
 
1. When the preheating effect is achieved, exit the heating box;
 
2. Raise the pressure plate to the highest point;
 
3. Load the plate, put the plate to the best position, and lower the pressure plate until it is consistent with the plate and pressed tightly;
 
4. Put the heating box back in place, turn on the heating button, and continue heating;
 
5. When the above procedures are over, observe the thermometer, if the temperature buffer drops to the lowest point, or the temperature rise speed, adjust the voltage, temperature, and time according to the actual situation;
 
6. During the heating process of the board, attention should be paid to changes, such as the blowing frequency, the surface of the board vibrates and waves, and the temperature is adjusted at any time to prevent the board from generating bubbles and fission when the temperature is too high;
 
Fourth, the blister stage
 
1. After the plate is heated, exit the heating box;
 
2. Raise the mould table to the top and lower the floating plate to the lowest point;
 
3. Start the vacuum blister button;
 
4. After the blister is finished, turn on the cooling fan to cool and shape the product.
 
Five, demoulding
 
1. Lower the mold, raise the floating plate, and raise the pressing plate;
 
2. Take out the product and place it in the finished product area.
 
The above content is the relevant content of "Five Steps in the Operation Process of Thick Film Blister Machine" collected and introduced by the editor of Yonghengsheng Blister Machine Network. I hope it will be helpful to you! ! Shenzhen Yonghengsheng Machinery Manufacturing Co., Ltd. has been committed to research and development for 16 years to provide Shenzhen blister machine, Shenzhen blister machine, Shenzhen vacuum blister machine, Shenzhen thick film blister machine, Shenzhen blister forming machine, Shenzhen thermoforming machine, Blister machine hotline: 0755-84817776
Website keywords: blister machine, vacuum blister machine, thick sheet blister machine, blister forming machine, blister machine, thermoplastic forming machine, Shenzhen vacuum blister machine manufacturer, Shenzhen blister machine manufacturer

Latest information

Shenzhen Yonghengsheng Machinery Manufacturing

Co., Ltd.

 

Phone: 0755-84817776 84807776
Fax: 0755-84808776

Mobile Phone:13828714526 屈先生
Email: yongheng@szyongheng.cn
Address: Building a, No.22, South Pingxi Road, Pingxi community, Pingdi street, Longgang District, Shenzhen

 

Copyright ©2020 Shenzhen Yonghengsheng Machinery Manufacturing Co., Ltd. 粤ICP备05089896号  by: www.300.cn